Rieth-Riley Construction Co., Inc.

  • Trustfeed ratings Icon
  • Trustfeed ratings Icon
  • Trustfeed ratings Icon
  • Trustfeed ratings Icon
  • Trustfeed ratings Icon

Gary, United States

rieth-riley.com
Road construction company· Asphalt contractor· Sand & gravel supplier· Asphalt mixing plant

Rieth-Riley Construction Co., Inc. Reviews | Rating 3.6 out of 5 stars (5 reviews)

Rieth-Riley Construction Co., Inc. is located in Gary, United States on 7500 W 5th Ave. Rieth-Riley Construction Co., Inc. is rated 3.6 out of 5 in the category road construction company in United States.

Address

7500 W 5th Ave

Phone

+1 2199770722

Accessibility

Wheelchair-accessible entrance

Open hours

...
Write review Claim Profile

M

Michelle Divinagracia

Never contracted this company, but I’d never recommend this business with an employee like this that represented in this way. As a business owner and 15 plus years in customer service, I would never want someone on my team or someone who had my business name treating others in such a manner as this man did. This man decided he wanted to bob and weave through the cones to carch up with a fully loaded 18- wheeler, cut it off, and then do 45 mph for about 10 miles on this highway. I understand if this man wanted to control traffic, or slow down traffic, but what I don’t understand is how are we supposed to conduct business, and all of the safety measurements that come with our jobs. Pictured is the man holding his phone, with NO hands on the wheel, while doing about 50 mph, as we’re trying to get through the construction and traffic through Indiana highway.

T

Therese O'Sullivan

While repaving a road in Kalkaska MI they only have one flagged who spends his time on his phone instead of regulating traffic. Sat on the road for 30 minutes for him to finally allow traffic to flow and no opposing traffic coming. If we were able to take about route, we would have but our destination was .5 miles down the road.

E

erick short

Dumped sand in the yard. I was in and out with no problems.

A

Amber Litko

They disappear for weeks at a time leaving the road half done. They monopolize intersections for red light after red light letting traffic build up for miles. (that's not an exaggeration) They begin road work right in front of a school at the start of the school day. They rar the entrances to large subdivisions right as the school day is ending. They have horrible signage for the plethora of lane changes necessary for 49

K

Karen Starkey

Best place to work. Good insurance and savings